# Stack Solidification Status **Date:** 2026-05-09 **Hygiene refresh:** 2026-05-10 ## Bottom Line The stack is buildable and internally gateable, but not promotable as a live hardware-accelerated system yet. ## Gates - Full Lean/Semantics build: `SKIPPED` - JSON integrity: `PASS` - Python shim compile: `PASS` - Support receipt refresh: `PASS` - Rainbow Raccoon compiler: `PASS_WITH_HOLDS` (1 candidate, 6 HOLD) - Tri-cycle audit: `PASS`; promotion decision `NO_PROMOTION` - FPGA software witness: `PASS` - FPGA hardware witness: `NOT_REQUESTED` - UART beacon seen: `False` - Hardware bitstreams present: `PASS` - Optional sem entity-diff aid: `OPTIONAL_AUDIT_AID_READY` - RRC HOLD closure checklist: `PASS_ALL_ITEMS_CLOSED` (0 open; compiler rerun still required before promotion) - Network HOLD manifests: `PASS_HOLD_QUEUES_DECLARED` (9 coefficient rows, 15 prediction rows) - Beaver mask freshness controls: `PASS_NEGATIVE_CONTROLS` (6 cases) - Whitespace-zero grammar: `PASS_ZERO_WHITESPACE_CANONICAL` (3 admitted, 3 HOLD) - Q16 virtual serial probe: `PASS_VIRTUAL_SERIAL` (3/3 matches) - UART transport routes: `PASS_ACTIVE_VIRTUAL_ROUTE` (active `virtual://q16-pty`) - Stack fail closure register: `PASS_TICKETS_DECLARED` (7 tickets) - SMN tool awareness: `PASS` (ADMIT_SMN_TOOL_AWARENESS) - Worktree: `DIRTY` - Staging manifest: `6-Documentation/docs/stack_solidification_staging_manifest_2026-05-09.md` ## Current Solid Core - Lean/Semantics builds end to end. - Core JSON receipts and network topology database parse. - Compiler gate admits only the Q16 fixed-point lowering certificate as candidate. - Q16 software witness lane passes. - Q16 host UART framing and parser pass over a PTY-backed virtual serial device. - UART route table now selects the PTY-backed Q16 route while keeping blocked physical routes visible. - HOLD buckets are explicit rather than silently promoted. - Optional sem entity extraction is available for scoped Python audit files. - SMN is tool-visible as Semantic Mass Number and explicitly separated from Mass Number admissibility packets. - Every compiler HOLD object now has an explicit closure checklist, and the RRC Gatekeeper has closed `11/11` documentation closures. - Current failures and broad HOLD buckets have closure tickets in a stack fail register. - Network topology coefficients and predictions are split into HOLD queues. - Beaver mask freshness has Lean-backed finite negative controls; full MPC security remains HOLD. - Canonical logogram grammar can derive ordinary spaces from symbol count/order with zero stored whitespace codes. - Agent routing now has repo-root, Lean/Semantics, and Infrastructure contracts. - Stack receipts and the network topology database are visible through narrow `.gitignore` exceptions instead of broad `shared-data/` exposure. ## Current Blockers - Live FPGA UART transport remains blocked: beacon receipts show no bytes on `/dev/ttyUSB0` or `/dev/ttyUSB1`. - Hardware acceleration claims remain blocked until the UART route or external adapter path produces matching receipts. - Security, coefficient, topology-prediction, and receipt-gate debts remain HOLD surfaces. - The worktree is broad and dirty; do not stage by directory sweep. - `/usr/bin/sem` is GNU Parallel on this machine; use the isolated sem binary path if sem is needed. ## Less Solid Surface Counts - `coefficient_or_calibration_debt`: 20 - `fpga_transport_or_witness_debt`: 9 - `general_hold_surface`: 69 - `receipt_gate_debt`: 11 - `security_proof_debt`: 6 - `topology_prediction_debt`: 13 ## Next Stabilization Moves 1. Resolve fabric UART transport with board bridge docs or an external USB-UART adapter. 2. Work the closure register tickets in order: UART transport, flash persistence, adaptive-mask security, coefficient calibration, topology predictions, receipt gates, then worktree scope. 3. Rerun the Rainbow Raccoon compiler against the refreshed closure receipts before changing any HOLD/CANDIDATE status. 4. Produce a scoped staging manifest before any commit because the working tree contains many unrelated/generated surfaces. ## Receipt - Machine receipt: `shared-data/data/stack_solidification/stack_solidification_receipt.json` - Staging manifest: `6-Documentation/docs/stack_solidification_staging_manifest_2026-05-09.md`