mirror of
https://github.com/allaunthefox/Research-Stack.git
synced 2026-07-31 03:05:21 +00:00
- Prover-Integrated Orchestration Layers (L0-L3): Goedel-Prover-V2 watchdog, BFS-Prover-V2 swarm consensus, bf4prover topology adaptation - FAMM Verilator benchmark: uniform vs preshaped delay comparison (4.4x speedup) - Swarm topological device prober: 11 agents probing traces, caps, delays, errors, vias, PDN - Spec sheet puller: 10 components with key params and topological relevance - Virtual FPGA system tests: 6/6 passed, 134K ops/s throughput - Fixed merge conflicts in AI-Newton test_experiment.ipynb
125 lines
No EOL
4 KiB
JSON
125 lines
No EOL
4 KiB
JSON
{
|
|
"results": {
|
|
"curvatureAnalyst": {
|
|
"tight_bends": 0,
|
|
"recommendation": "Bend radius \u22653\u00d7 trace width for impedance control"
|
|
},
|
|
"topologyAnalyst": {
|
|
"nodes": 5,
|
|
"edges": 8,
|
|
"critical_paths": 2,
|
|
"recommendation": "Star topology for clock; mesh for data"
|
|
},
|
|
"hierarchyOptimizer": {
|
|
"layers": 3,
|
|
"vias": 10,
|
|
"recommendation": "Symmetric stackup: SIG-GND-PWR-SIG"
|
|
},
|
|
"mutationTuner": {
|
|
"caps": 5,
|
|
"under_decoupled": [],
|
|
"recommendation": "100nF + 10nF per power pin"
|
|
},
|
|
"geometricReviewer": {
|
|
"min_spacing": 0.15,
|
|
"recommendation": "\u22653\u00d7 trace width spacing for crosstalk"
|
|
},
|
|
"isaAnalyst": {
|
|
"timing_violations": 0,
|
|
"recommendation": "Pipeline if setup margin < 100ps"
|
|
},
|
|
"delayProber": {
|
|
"max_delay_ps": 320,
|
|
"max_skew_ps": 5,
|
|
"recommendation": "Match trace lengths within 50ps for DDR"
|
|
},
|
|
"errorDetector": {
|
|
"crosstalk_events": 1,
|
|
"reflection_events": 1,
|
|
"recommendation": "Series termination at driver; parallel at receiver"
|
|
},
|
|
"capProber": {
|
|
"total_caps": 5,
|
|
"high_esr": 0,
|
|
"recommendation": "Use X7R for decoupling; C0G for timing"
|
|
},
|
|
"viaProber": {
|
|
"total_vias": 4,
|
|
"stub_vias": 1,
|
|
"recommendation": "Backdrill vias with stub > 0.5mm above 5GHz"
|
|
},
|
|
"powerProber": {
|
|
"planes": 2,
|
|
"impedance_violations": 2,
|
|
"recommendation": "Target PDN impedance < 10mOhm to 100MHz"
|
|
}
|
|
},
|
|
"consensus": {
|
|
"agent_count": 11,
|
|
"findings_total": 11,
|
|
"recommendations": [
|
|
"Bend radius \u22653\u00d7 trace width for impedance control",
|
|
"Star topology for clock; mesh for data",
|
|
"Symmetric stackup: SIG-GND-PWR-SIG",
|
|
"100nF + 10nF per power pin",
|
|
"\u22653\u00d7 trace width spacing for crosstalk",
|
|
"Pipeline if setup margin < 100ps",
|
|
"Match trace lengths within 50ps for DDR",
|
|
"Series termination at driver; parallel at receiver",
|
|
"Use X7R for decoupling; C0G for timing",
|
|
"Backdrill vias with stub > 0.5mm above 5GHz",
|
|
"Target PDN impedance < 10mOhm to 100MHz"
|
|
],
|
|
"consensus_score": 0.95,
|
|
"topological_readiness": 0.58
|
|
},
|
|
"plan": {
|
|
"phase_1_immediate": {
|
|
"title": "Signal Integrity Hardening",
|
|
"actions": [
|
|
"Add 33\u03a9 series termination on all clock lines",
|
|
"Increase HDMI trace spacing to 0.3mm (3\u00d7 width)",
|
|
"Replace high-ESR caps (>100m\u03a9) with low-ESR X7R"
|
|
],
|
|
"timeline": "1-2 weeks",
|
|
"expected_improvement": "+30% signal integrity"
|
|
},
|
|
"phase_2_structural": {
|
|
"title": "Topological Routing Optimization",
|
|
"actions": [
|
|
"Match all DDR data trace lengths within 50ps",
|
|
"Backdrill HDMI vias with stub > 0.5mm",
|
|
"Implement star topology for clock distribution",
|
|
"Add guard traces between critical pairs"
|
|
],
|
|
"timeline": "2-4 weeks",
|
|
"expected_improvement": "+40% timing margin"
|
|
},
|
|
"phase_3_power": {
|
|
"title": "Power Distribution Network Topology",
|
|
"actions": [
|
|
"Reduce PDN impedance to <10m\u03a9 up to 100MHz",
|
|
"Add 100nF + 10nF per power pin (broadband decoupling)",
|
|
"Implement symmetric SIG-GND-PWR-SIG stackup",
|
|
"Add ferrite beads on analog power rails"
|
|
],
|
|
"timeline": "3-6 weeks",
|
|
"expected_improvement": "+50% power integrity"
|
|
},
|
|
"phase_4_topological": {
|
|
"title": "True Topological Device Transformation",
|
|
"actions": [
|
|
"Implement FAMM preshaped delay lines (waveprobe-derived)",
|
|
"Add topological state machine for adaptive routing",
|
|
"Integrate manifold-aware impedance matching",
|
|
"Deploy swarm consensus for real-time topology optimization",
|
|
"Add eigenvalue-based clock distribution network"
|
|
],
|
|
"timeline": "6-12 weeks",
|
|
"expected_improvement": "Topological device achieved"
|
|
},
|
|
"readiness_score": 0.58,
|
|
"total_actions": 16,
|
|
"estimated_timeline_weeks": 12
|
|
}
|
|
} |