BioSight/dag/graph.md
allaun fe190a6558 chore(roadmap): promote RRC status to Verified and synchronize graph.json
Updated RRC node status to Verified in graph.md and graph.json following
the completion of the multi-agent consensus review and verified test
units integration.

Build: 0 failures
2026-06-27 23:28:06 -05:00

836 B

Project DAG - BioSight/SilverSight

Visual Representation (Mermaid)

graph TD
    %% Core Foundation
    FP[FixedPoint Q16_16] --> RRC[RRC Classification]
    FP --> AVM[AVMIsa Output Boundary]
    
    %% Logic Flow
    RRC --> Semantics[Semantics Core]
    Semantics --> DNA[DNA Encoding Pipeline]
    
    %% Infrastructure & Shims
    DNA --> Rigour[Rigour Pipeline]
    Rigour --> Lean[SilverSight Formalization]
    
    %% Verification Loop
    Lean --> Build{Lake Build}
    Build -- Fail --> Audit[Audit/Fix Loop]
    Audit --> Lean
    Build -- Pass --> Verified((Verified))

Node Status Registry

  • FP: 🟢 Verified
  • RRC: 🟢 Verified
  • AVM: Pending
  • Semantics: Pending
  • DNA: 🟢 Verified
  • Rigour: 🟢 Verified
  • Lean: 🟢 Verified
  • Audit: 🟢 Verified