mirror of
https://github.com/allaunthefox/Research-Stack.git
synced 2026-07-31 03:05:21 +00:00
4.2 KiB
4.2 KiB
Stack Solidification Status
Date: 2026-05-09
Hygiene refresh: 2026-05-10
Bottom Line
The stack is buildable and internally gateable, but not promotable as a live hardware-accelerated system yet.
Gates
- Full Lean/Semantics build:
SKIPPED - JSON integrity:
PASS - Python shim compile:
PASS - Support receipt refresh:
PASS - Rainbow Raccoon compiler:
PASS_WITH_HOLDS(1 candidate, 6 HOLD) - Tri-cycle audit:
PASS; promotion decisionNO_PROMOTION - FPGA software witness:
PASS - FPGA hardware witness:
NOT_REQUESTED - UART beacon seen:
False - Hardware bitstreams present:
PASS - Optional sem entity-diff aid:
OPTIONAL_AUDIT_AID_READY - RRC HOLD closure checklist:
PASS_ALL_ITEMS_CLOSED(0 open; compiler rerun still required before promotion) - Network HOLD manifests:
PASS_HOLD_QUEUES_DECLARED(9 coefficient rows, 15 prediction rows) - Beaver mask freshness controls:
PASS_NEGATIVE_CONTROLS(6 cases) - Whitespace-zero grammar:
PASS_ZERO_WHITESPACE_CANONICAL(3 admitted, 3 HOLD) - Q16 virtual serial probe:
PASS_VIRTUAL_SERIAL(3/3 matches) - UART transport routes:
PASS_ACTIVE_VIRTUAL_ROUTE(activevirtual://q16-pty) - Stack fail closure register:
PASS_TICKETS_DECLARED(7 tickets) - SMN tool awareness:
PASS(ADMIT_SMN_TOOL_AWARENESS) - Worktree:
DIRTY - Staging manifest:
6-Documentation/docs/stack_solidification_staging_manifest_2026-05-09.md
Current Solid Core
- Lean/Semantics builds end to end.
- Core JSON receipts and network topology database parse.
- Compiler gate admits only the Q16 fixed-point lowering certificate as candidate.
- Q16 software witness lane passes.
- Q16 host UART framing and parser pass over a PTY-backed virtual serial device.
- UART route table now selects the PTY-backed Q16 route while keeping blocked physical routes visible.
- HOLD buckets are explicit rather than silently promoted.
- Optional sem entity extraction is available for scoped Python audit files.
- SMN is tool-visible as Semantic Mass Number and explicitly separated from Mass Number admissibility packets.
- Every compiler HOLD object now has an explicit closure checklist, and the RRC Gatekeeper has closed
11/11documentation closures. - Current failures and broad HOLD buckets have closure tickets in a stack fail register.
- Network topology coefficients and predictions are split into HOLD queues.
- Beaver mask freshness has Lean-backed finite negative controls; full MPC security remains HOLD.
- Canonical logogram grammar can derive ordinary spaces from symbol count/order with zero stored whitespace codes.
- Agent routing now has repo-root, Lean/Semantics, and Infrastructure contracts.
- Stack receipts and the network topology database are visible through narrow
.gitignoreexceptions instead of broadshared-data/exposure.
Current Blockers
- Live FPGA UART transport remains blocked: beacon receipts show no bytes on
/dev/ttyUSB0or/dev/ttyUSB1. - Hardware acceleration claims remain blocked until the UART route or external adapter path produces matching receipts.
- Security, coefficient, topology-prediction, and receipt-gate debts remain HOLD surfaces.
- The worktree is broad and dirty; do not stage by directory sweep.
/usr/bin/semis GNU Parallel on this machine; use the isolated sem binary path if sem is needed.
Less Solid Surface Counts
coefficient_or_calibration_debt: 20fpga_transport_or_witness_debt: 9general_hold_surface: 69receipt_gate_debt: 11security_proof_debt: 6topology_prediction_debt: 13
Next Stabilization Moves
- Resolve fabric UART transport with board bridge docs or an external USB-UART adapter.
- Work the closure register tickets in order: UART transport, flash persistence, adaptive-mask security, coefficient calibration, topology predictions, receipt gates, then worktree scope.
- Rerun the Rainbow Raccoon compiler against the refreshed closure receipts before changing any HOLD/CANDIDATE status.
- Produce a scoped staging manifest before any commit because the working tree contains many unrelated/generated surfaces.
Receipt
- Machine receipt:
shared-data/data/stack_solidification/stack_solidification_receipt.json - Staging manifest:
6-Documentation/docs/stack_solidification_staging_manifest_2026-05-09.md