Research-Stack/6-Documentation/docs/stack_solidification_status_2026-05-09.md
2026-05-11 22:08:10 -05:00

4.2 KiB

Stack Solidification Status

Date: 2026-05-09

Hygiene refresh: 2026-05-10

Bottom Line

The stack is buildable and internally gateable, but not promotable as a live hardware-accelerated system yet.

Gates

  • Full Lean/Semantics build: SKIPPED
  • JSON integrity: PASS
  • Python shim compile: PASS
  • Support receipt refresh: PASS
  • Rainbow Raccoon compiler: PASS_WITH_HOLDS (1 candidate, 6 HOLD)
  • Tri-cycle audit: PASS; promotion decision NO_PROMOTION
  • FPGA software witness: PASS
  • FPGA hardware witness: NOT_REQUESTED
  • UART beacon seen: False
  • Hardware bitstreams present: PASS
  • Optional sem entity-diff aid: OPTIONAL_AUDIT_AID_READY
  • RRC HOLD closure checklist: PASS_ALL_ITEMS_CLOSED (0 open; compiler rerun still required before promotion)
  • Network HOLD manifests: PASS_HOLD_QUEUES_DECLARED (9 coefficient rows, 15 prediction rows)
  • Beaver mask freshness controls: PASS_NEGATIVE_CONTROLS (6 cases)
  • Whitespace-zero grammar: PASS_ZERO_WHITESPACE_CANONICAL (3 admitted, 3 HOLD)
  • Q16 virtual serial probe: PASS_VIRTUAL_SERIAL (3/3 matches)
  • UART transport routes: PASS_ACTIVE_VIRTUAL_ROUTE (active virtual://q16-pty)
  • Stack fail closure register: PASS_TICKETS_DECLARED (7 tickets)
  • SMN tool awareness: PASS (ADMIT_SMN_TOOL_AWARENESS)
  • Worktree: DIRTY
  • Staging manifest: 6-Documentation/docs/stack_solidification_staging_manifest_2026-05-09.md

Current Solid Core

  • Lean/Semantics builds end to end.
  • Core JSON receipts and network topology database parse.
  • Compiler gate admits only the Q16 fixed-point lowering certificate as candidate.
  • Q16 software witness lane passes.
  • Q16 host UART framing and parser pass over a PTY-backed virtual serial device.
  • UART route table now selects the PTY-backed Q16 route while keeping blocked physical routes visible.
  • HOLD buckets are explicit rather than silently promoted.
  • Optional sem entity extraction is available for scoped Python audit files.
  • SMN is tool-visible as Semantic Mass Number and explicitly separated from Mass Number admissibility packets.
  • Every compiler HOLD object now has an explicit closure checklist, and the RRC Gatekeeper has closed 11/11 documentation closures.
  • Current failures and broad HOLD buckets have closure tickets in a stack fail register.
  • Network topology coefficients and predictions are split into HOLD queues.
  • Beaver mask freshness has Lean-backed finite negative controls; full MPC security remains HOLD.
  • Canonical logogram grammar can derive ordinary spaces from symbol count/order with zero stored whitespace codes.
  • Agent routing now has repo-root, Lean/Semantics, and Infrastructure contracts.
  • Stack receipts and the network topology database are visible through narrow .gitignore exceptions instead of broad shared-data/ exposure.

Current Blockers

  • Live FPGA UART transport remains blocked: beacon receipts show no bytes on /dev/ttyUSB0 or /dev/ttyUSB1.
  • Hardware acceleration claims remain blocked until the UART route or external adapter path produces matching receipts.
  • Security, coefficient, topology-prediction, and receipt-gate debts remain HOLD surfaces.
  • The worktree is broad and dirty; do not stage by directory sweep.
  • /usr/bin/sem is GNU Parallel on this machine; use the isolated sem binary path if sem is needed.

Less Solid Surface Counts

  • coefficient_or_calibration_debt: 20
  • fpga_transport_or_witness_debt: 9
  • general_hold_surface: 69
  • receipt_gate_debt: 11
  • security_proof_debt: 6
  • topology_prediction_debt: 13

Next Stabilization Moves

  1. Resolve fabric UART transport with board bridge docs or an external USB-UART adapter.
  2. Work the closure register tickets in order: UART transport, flash persistence, adaptive-mask security, coefficient calibration, topology predictions, receipt gates, then worktree scope.
  3. Rerun the Rainbow Raccoon compiler against the refreshed closure receipts before changing any HOLD/CANDIDATE status.
  4. Produce a scoped staging manifest before any commit because the working tree contains many unrelated/generated surfaces.

Receipt

  • Machine receipt: shared-data/data/stack_solidification/stack_solidification_receipt.json
  • Staging manifest: 6-Documentation/docs/stack_solidification_staging_manifest_2026-05-09.md